Mineral Sands Project: Victoria, Australia

Late in 2018 Oreflow were contracted to supply 2, 2400×4800 Horizontal dewatering screens for a mineral sands project in Victoria, Australia. The product comes in with about 40-50% moisture and after the screening process it leaves with around 7%, well within the margins required. Once the feed section of the operation has been refined the clients expects to see an extra 2% moisture removed from the finished product.